Upcoming and completed maintenances

Network: DE-FRA-1 Edge router reload

completed

During the time-window one of our Edge Routers will be rebooted. During the short reboot, we will be running in reduced capacity mode. No impact is expected.

Compute API Maintenance

completed

We will perform maintenance on our Compute API. Customer workloads will not be affected but the API will be temporarily unavailable during a very short amount of time.

Snapshots maintenance

completed

Snapshots will be disabled to allow the compute API maintenance. On-going snapshots will be canceled at the beginning of the compute API maintenance.

de-fra-1: GEANT peering maintenance

completed

In the mentioned time window, our GEANT link provide is doing software maintenance on their equipment. A downtime of up to 1 hour can be expected. Some of the traffic might use different paths and latency increase is expected.

Network: de-fra-1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in de-fra-1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

CH-DK-2 Non impacting network maintenance

completed

During the maintenance window we are going to perform a power remediation maintenance on some core network equipments, No impact is expected.

Network: ch-dk-2 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in ch-dk-2.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: ch-gva-2 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in ch-gva-2.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: bg-sof-1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in %zone%.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: de-muc-1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in %zone%.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

ZRH1 Transit Network: Reduced capacity mode

completed

During this time window we will do maintenance on one of our Transit Uplink. No impact is expected.

GV2 Transit Network: Reduced capacity mode

completed

During this time window we will do maintenance on one of our Transit Uplink. No impact is expected.

ZRH1 Transit Network: Reduced capacity mode

completed

During this time window we will do maintenance on one of our Transit Uplink. No impact is expected.

GV2 Transit Network: Reduced capacity mode

completed

During this time window we will do maintenance on one of our Transit Uplink. No impact is expected.

CH-DK-2: Non impacting power maintenance

completed

We are going to perform a power maintenance in one of our core infrastructure rack at CH-DK2. During the maintenance window the power redundancy will be reduced at N.

CH-GVA-2 Datacenter power emergency maintenance

completed

Our datacenter provider is going to conduct an emergency power maintenance at CH-GVA-2 to repair a failed switchboard. During the maintenance window the power redundancy will be reduced at N.

Network: DE-FRA-1 Edge router reload

completed

During the time-window one of our Edge Routers will be rebooted. During the short reboot, we will be running in reduced capacity mode. No impact is expected.

Compute API Maintenance

completed

We will perform maintenance on our Compute API. Customer workloads will not be affected but a higher latency might be experienced.

Network: zrh1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in zrh1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: MUC1 internet upstream maintenance

completed

One of our upstream network providers will perform an emergency maintenance in MUC1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Compute API Maintenance

completed

We will perform maintenance on our Compute API. Customer workloads will not be affected but the API will be temporarily unavailable.

Managed Private Networks: DHCP server migration

completed

We will perform the migration of our DHCP server for Managed Private Networks.
No impact expected.

CH-GVA-2: maintenance of the NLB infrastructure

completed

We are going to restart NLB underlying machines in ch-gva-2 in order to complete an upgrade procedure.
No impact is expected from a user point of view, but NLB instances will lose redundancy at some point during the maintenance time ...

DE-FRA-1: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in DE-FRA-1. Customer workloads will not be affected.

NLB maintenance in the de-fra-1 zone

completed

We are going to restart NLB underlying machines in de-fra-1 in order to complete an upgrade procedure.
No impact is expected from a user point of view, but NLB instances will lose redundancy at some point during the maintenance time ...

Runstatus Maintenance

completed

Due to a database maintenance, the runstatus service will be temporarily unavailable.

Network: DE-FRA-1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in DE-FRA-1.
During the maintenance, the traffic will be re-routed through an alternate provider.
No impact is expected.

Object Storage Maintenance in ch-gva-2

completed

Between October 6th and October 13th, 2022, we are going to proceed with an upgrade of our object storage metadata store in our Geneva (ch-gva-2) location. This component holds object metadata and references to the underlying storage layer.

As part ...

Object Storage maintenance in at-vie-1

completed

We are scheduling a short-notice maintenance operation in our at-vie-1 Object Storage cluster. Storage and retrieval latencies may be impacted.

Object Storage Maintenance in ch-gva-2

completed

Between September 19th and September 23rd, 2022, we are going to proceed with an upgrade of our object storage metadata store in our Geneva (ch-gva-2) location. This component holds object metadata and references to the underlying storage layer.

As part ...

NLB maintenance in all zones

completed

Between September 6, 2022 and September 8, 2022, we are going to proceed with an upgrade of the backend services supporting our Network Load Balancer offering.

Each customer NLB will go through a migration process. During this process:

* NLB ...

Object Storage Maintenance in ch-dk-2

completed

Between September 5th and September 16th, 2022, we are going to proceed with an upgrade of our object storage metadata store in our Zürich (ch-dk-2) location. This component holds object metadata and references to the underlying storage layer.

As part ...

Object Storage Maintenance in de-fra-1 and at-vie-1

completed

Between August 22nd and September 2nd, 2022, we are going to proceed with an upgrade of our object storage metadata store in our Frankfurt and Vienna locations. This component holds object metadata and references to the underlying storage layer.

As ...

CH-GVA-2: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in CH-GVA-2. Customer workloads will not be affected.

CH-GVA-2: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in CH-GVA-2. Customer workloads will not be affected.

Network: upstream maintenance in DE-FRA-1, CH-GVA-2 and CH-DK-2

completed

One of our upstream network providers will perform maintenance in DE-FRA-1, CH-GVA-2 and CH-DK-2.
Internet traffic will be re-routed through alternate provider during the maintenance and no service will be affected.

Network: upstream maintenance in AT-VIE-1

completed

One of our upstream network providers will perform maintenance in AT-VIE-1.
Internet traffic will be re-routed through alternate provider during the maintenance and no service will be affected.

Network: upstream maintenance in DE-FRA-1, CH-GVA-2 and CH-DK-2

completed

One of our upstream network providers will perform maintenance in DE-FRA-1, CH-GVA-2 and CH-DK-2.
Internet traffic will be re-routed through alternate provider during the maintenance and no service will be affected.

CH-ZRH-1: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in CH-ZRH-1 aka DK2. Customer workloads will not be affected.

Object Storage Maintenance

completed

Between July 4th and July 22, 2022, we are going to proceed with an upgrade of our object storage metadata store. This component holds object metadata and references to the underlying storage layer.

As part of this upgrade, your bucket(s) ...

Network: Maintenance at GVA2

completed

We will be doing network maintenance that shouldn't have any customer impact, however we will be running with reduced redundancy for a short period of time.

Network: Maintenance at GVA2

completed

We will be doing network maintenance that shouldn't have any customer impact, however we will be running with reduced redundancy for a short period of time.

AT-VIE-1: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in AT-VIE-1. Customer workloads will not be affected.

BG-SOF-1: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in BG-SOF-1. Customer workloads will not be affected.

BG-SOF-1: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in BG-SOF-1. Customer workloads will not be affected.

Network: ch-gva-2 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in ch-gva-2.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: Maintenance at SOF1

completed

We will be conducting a network maintenance that should have no customer impact, however for a short period of time(up to 15 min) we will be running in reduced redundancy mode.

Instance Pools: Maintenance

completed

We are going to perform a maintenance on our Instance Pools service. Interactions with Instance Pools might not succeed.

DE-MUC-1: maintenance for secondary network

completed

We will perform maintenance for our secondary (out of band) network in DE-MUC-1. Customer workloads will not be affected.

Instance Pools: SOF1 Maintenance

completed

We are going to perform a maintenance on our Instance Pools service. Interactions with Instance Pools might not succeed.

Network: Maintenance at GV2

completed

During the time window we will restart some services. No customer impact is expected.

Network: upstream maintenance in DE-MUC-1

completed

One of our upstream provider will be performing maintenance in our DE-MUC-1 data center. This should have no impact on our services as we'll reroute the affected network traffic through our other providers.

Network: sof1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in sof1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: gva2 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in gva2.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: muc1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in muc1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

CH-GVA-2: Power maintenance

completed

Our datacenter provider is going to perform a power maintenance. During the maintenance window the power redundancy of our equipments will be reduce to N for a maximum of 60 minutes per equipment. No impact is expected.

CH-GVA-2: Power maintenance

completed

Our datacenter provider is going to perform a power maintenance. During the maintenance window the power redundancy of our equipments will be reduce to N for a maximum of 60 minutes per equipment. No impact is expected.

AT-VIE-1 Internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in CH-GVA-2
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Maintenance in AT-VIE-1

completed

During the window, a test of the redudant electrical system will take place. No customer impact is expected.

Maintenance in AT-VIE-1

completed

During the window, a test of the redudant electrical system will take place. No customer impact is expected.

DE-MUC-1: Network router maintenance

completed

We are going to perform maintenance on one of our network edge routers in DE-MUC-1. Traffic will be rerouted to avoid customer impact.

CH-GVA-2: Network maintenance

completed

During the specified timeframe we will be replacing two Top of Rack switches in CH-GVA-2. Traffic will be rerouted accordingly to avoid any impact for customers. Some latency can potentially occur.

Network: CH-GVA-2 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in CH-GVA-2
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: CH-DK-2 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in CH-DK-2
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

CH-GVA-2: Network router maintenance

completed

We are going to perform maintenance on one of our network edge routers in CH-GVA-2. Traffic will be rerouted to avoid customer impact. You might still experience increased latency during the specified timeframe.

DNS API maintenance

completed

Our DNS partner is going to perform a maintenance on their DNS API. During this window, we expect that the API will become briefly unavailable.

DNS resolution will not be affected during this window.

CH-GVA-2: Network maintenance

completed

During the specified timeframe we will be replacing two Top of Rack switches in CH-GVA-2. Traffic will be rerouted accordingly to avoid any impact for customers. Some latency can potentially occur.

CH-GVA-2: Network router maintenance

completed

We are going to perform maintenance on one of our network edge routers in CH-GVA-2. Traffic will be rerouted to avoid customer impact. You might still experience increased latency during the specified timeframe.

Network maintenance at CH-GVA-2

completed

During the maintenance we will proceed with TOR (Top of the rack) network switch upgrades at CH-GVA-2. No impact is expected.

DNS API maintenance

completed

Our DNS partner is going to perform a maintenance on their DNS API. During this window, we expect that the API will become briefly unavailable.

DNS resolution will not be affected during this window.

Emergency network maintenance at CH-GVA-2

completed

We're going to perform an emergency maintenance on our edge routers at CH-GVA-2. During the maintenance window traffic will be re-routed to the remaining edge router and internet transit providers. No impact is expected.

Network: DE-FRA-1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in DE-FRA-1
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network emergency maintenance at CH-GVA-2

completed

We're going to perform an emergency maintenance on our Edge routers at CH-GVA-2. During the maintenance window traffic will be re-routed to the remaining Edge router and internet transit providers. Redundancy will be at N. No impact is expected.

Network: SOF1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in SOF1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: muc1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in MUC1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: muc1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in MUC1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Private Networks API maintenance

completed

We're going to perform a maintenance on the "Private Networks" system. During the maintenance window the "Private Networks" API will not be available.

CH-GVA-2: Internet network transit maintenance

completed

We're going to perform a maintenance on our Edge network internet transit links. During the maintenance traffic will be re-routed to alternate transit providers. No impact is expected

CH-DK-2: Internet network transit maintenance

completed

We're going to perform a maintenance on our Edge network internet transit links. During the maintenance traffic will be re-routed to alternate transit providers. No impact is expected

DNS API maintenance

completed

Our partner is going to perform a scheduled maintenance on their DNS API. During that window record management will not be possible. DNS resolution will not be affected

Network: Maintenace at BG-SOF-1

completed

One of our internet upstream network provider is going to perform a maintenance in BG-SOF-1.
During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Instance Pool API maintenance

completed

We're going to perform a maintenance on the maintenance pool system. During the maintenance window instance pool API will not be available

Network: Maintenance at FRA1

completed

We will be applying some configuration changes on one of our Edge routers. No impact is expected.

API scheduled maintenance

completed

The Compute API will be unavailable for a scheduled maintenance

Network: ZRH1 internet upstream maintenance

completed

One of our upstream network providers will perform maintenance in ZRH1.
During the maintenance the traffic will be re-routed through alternate provider.
No impact expected.

Network: Maintenance at ZRH1

completed

During the window we will replace an equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

AT-VIE-1 Network internet upstream maintenance

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in AT-VIE-1.
During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Network: maintenance at VIE1

completed

We will perform maintenance work on one of VIE1 core routers. There should be no customer impact as traffic will be rerouted.

DE-MUC-1: Increase internet network latency

completed

We're investigating an increase in internet network latency at DE-MUC-1

API maintenance

completed

We're going to perform a maintenance on the compute API. During the maintenance window a downtime of the API is expected for 5 to 10 minutes

VIE1 emergency router reboot

completed

An emergency reboot is required on one of our routers in MUC1. During the reboot traffic will be re-routed to other routers so no impact is expected.

MUC1 router reboot

completed

An reboot is required on one of our routers in MUC1. During the reboot traffic will be re-routed to other routers so no impact is expected.

MUC1 emergency router reboot

completed

An emergency reboot is required on one of our routers in MUC1. During the reboot traffic will be re-routed to other routers so no impact is expected.

Compute API maintenance

completed

We're going to conduct a maintenance on the compute API. No impact expected

Network: Maintenance at GV2

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at FRA1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at VIE1 and FRA1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at SOF1 and VIE1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at SOF1 and MUC1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at ZRH1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at GV2

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at ZRH1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at MUC1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at FRA1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at FRA1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at GV2

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Emergency maintenance in CH-DK-2

completed

We need to perform an emergency maintenance on our backbone switches in CH-DK-2

Network: Maintenance at MUC1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at GV2 and VIE1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at GV2 and VIE1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at SOF1 and GV2

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at ZRH1 and GV2

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at SOF1 and GV2

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

Network: Maintenance at ZRH1

completed

During the window we will upgrade some equipment in our network. There should be no customer impact however some instances might encounter an increase in latency.

AT-VIE-1 Network internet upstream maintenance

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in AT-VIE-1.
During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Network: Maintenance at SOF1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at SOF1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at GV2

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at ZRH1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Compute snapshot feature maintenance

completed

We're going to perform a maintenance on the snapshot infrastructure.
Snapshot operations may be unavailable during the maintenance.

The maintenance will be done in all zones (ch-gva-2, ch-dk-2, at-vie-1, de-fra-1, bg-sof-1, de-muc-1)

Network: Maintenance at ZRH1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at ZRH1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at ZRH1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at VIE1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at VIE1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at VIE1

completed

During the window we will upgrade some equipment in our network. No impact is expected as traffic is re-routed.

Network: Emergency maintenance at VIE1

completed

During the window we will restart the routing daemon on some equipment. No impact is expected as traffic is re-routed.

CH-GVA-2 Compute API maintenance

completed

During the maintenance you may experience few minutes of disruption of these services:

- Manage Privnets
- Instance pools
- Templates Register

Compute API maintenance

completed

We're going to perform a maintenance on the compute API.
We don't expect any downtime during the maintenance window but in some cases, a very short impact may happen (few seconds).

Network: Maintenance at FRA1

completed

During the window we will upgrade an equipment in our network. No impact is expected as traffic is re-routed.

CH-DK-2 Compute API maintenance

completed

We're going to perform a maintenance on the compute API in CH-DK-2.
During the maintenance you may experience few minutes of disruption of these services:

- Manage Privnets
- Instance pools
- Templates Register

DE-FRA-1 Compute API maintenance

completed

We're going to perform a maintenance on the compute API in DE-FRA-1.
During the maintenance you may experience few minutes of disruption of these services:

- Manage Privnets
- Instance pools
- Templates Register

Network: Maintenance at FRA1

completed

During the window we will upgrade an equipment in our network. No impact is expected as traffic is re-routed.

Network: Emergency maintenance at FRA1

completed

During the window we will replace an equipment in our network. No impact is expected as traffic is re-routed.

Network: Maintenance at VIE1

completed

During the window we will do some network changes. No impact is expected.

MUC1: Network core backbone updates

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in MUC-1. During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Network: Emergency maintenance at GV2

completed

During the window we will do some minor network changes. No impact is expected.

Network: Emergency maintenance at FRA1

completed

During the window we will do some minor network changes. No impact is expected.

Network: Emergency maintenance at VIE1

completed

During the window we will do some minor network changes. No impact is expected.

Compute API maintenance

completed

We're going to perform a maintenance on the compute API.
We don't expect any downtime during the maintenance window but in some cases, a very short impact may happen (few seconds)

VIE1: Network core backbone updates

completed

During the maintenance window we are going to upgrade the software running on one of our equipment. No impact is expected.

VIE1: Object Storage maintenance

completed

We will perform a maintenance on the Object Storage in VIE1. We don't expect any downtime during the maintenance window but in some cases, you might experience a brief network latency spike.

VIE1: Network core backbone updates

completed

During the maintenance window we are going to upgrade the software running on one of our equipment. No impact is expected.

FRA1: Network core backbone updates

completed

During the maintenance window we are going to upgrade the software running on one of our equipment. No impact is expected.

GV2: Network core backbone updates

completed

During the maintenance window we are going to make some configuration changes. No impact is expected.

BG-SOF-1: Network internet upstream maintenance

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in BG-SOF-1. During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

FRA1, ZRH1 and GV2: Network core backbone updates

completed

During the maintenance window we are going to make some configuration changes. No impact is expected.

SOF1 and VIE1: Network core backbone updates

completed

During the maintenance window we are going to make some configuration changes. No impact is expected.

MUC1: Network core backbone updates

completed

During the maintenance window we are going to make some configuration changes. No impact is expected.

Compute API maintenance

completed

We're going to perform a maintenance on the compute API.
The private network and network interface API will be unavailable during the maintenance.

Network: Emergency maintenance at ZRH1

completed

During the window we will do some minor network changes. No impact is expected.

Network: Infrastructure upgrade at CH-GV-2

completed

During the maintenance window we are going to upgrade our edge network equipment to provide capacity, performance and scalability improvements. There will be two short network cuts for a couple of seconds until the traffic is re-routed and during the ...

Network: Infrastructure upgrade at CH-GV-2

completed

During the maintenance window we are going to upgrade our edge network equipment to provide capacity, performance and scalability improvements. There will be two short network cuts for a couple of seconds until the traffic is re-routed for some customers.

Network: Emergency maintenance at CH-DK-2

completed

During the window we are going to restart a routing service.
No impact is expected, however redundancy will be reduced during the maintenance.

API compute emergency maintenance

completed

We're conducting an emergency maintenance on the compute API. Less than 5 minutes downtime is expected

DE-FRA-1: Network core backbone upgrade

completed

During the maintenance window we are going to upgrade our core network backbone to provide capacity, performance and scalability improvements. No impact is expected, however redundancy will be reduced during the maintenance.

Compute API maintenance

completed

We're going to perform a maintenance on the compute API.
We don't expect any downtime during the maintenance window but in some cases, a very short impact may happen (less than 10s)

Compute API maintenance

completed

We're going to perform a maintenance on the compute API. The private network and network interface API will be unavailable during the maintenance. You will also not be able to deploy new virtual machines attached to private networks.

Network: Emergency maintenance at AT-VIE-1

completed

During the window we are going to restart a routing service. There will be a short service cut (up to 1 min) only for the customers using the Private Connect service in Vienna.

Network maintenance at CH-DK-2

completed

We're going to perform a preventive network maintenance at CH-DK-2 to replace potential faulty hardware. No impact is expected.

Network maintenance at ZRH1

completed

During the maintenance window we're going to perform an upgrade of our backbone switches. No impact is expected.

Compute API maintenance

completed

We're going to perform a maintenance on the compute API. No impact expected.

Network: Infrastructure upgrade at CH-GV-2

completed

During the window we are going to do a hardware and software upgrade of a part of our network infrastructure. No impact is expected.

Compute: host storage maintenance at CH-DK-2

completed

During the window we are going to upgrade the storage SSDs firmware of part of our hypervisor fleet. No impact is expected.

Compute: host storage maintenance at AT-VIE-1

completed

During the window we are going to upgrade the storage SSDs firmware of part of our hypervisor fleet. No impact is expected.

Compute: host storage maintenance at DE-FRA-1

completed

During the window we are going to upgrade the storage SSDs firmware of part of our hypervisor fleet. No impact is expected.

Intel MDS vulnerabilities mitigation emergency maintenance

completed

We are deploying the Intel MDS vulnerabilities mitigation. No impact is expected for your instances. All zones are concerned.

More information may be found here: https://www.exoscale.com/syslog/mds-zombieload-ridl-fallout/

Intel MDS vulnerabilities mitigation emergency maintenance

completed

We are deploying the Intel MDS vulnerabilities mitigation. No impact is expected for your instances. All zones are concerned.

More information may be found here: https://www.exoscale.com/syslog/mds-zombieload-ridl-fallout/

Intel MDS vulnerabilites mitigation emergency maintenance

completed

We are deploying the Intel MDS vulnerabilities mitigation. No impact is expected for your instances. All zones are concerned.

More information may be found here: https://www.exoscale.com/syslog/mds-zombieload-ridl-fallout/

Intel MDS vulnerabilites mitigation emergency maintenance

completed

We are deploying the Intel MDS vulnerabilities mitigation. No impact is expected for your instances. All zones are concerned.

More information may be found here: https://www.exoscale.com/syslog/mds-zombieload-ridl-fallout/

Intel MDS vulnerabilites mitigation emergency maintenance

completed

We are deploying the Intel MDS vulnerabilities mitigation. No impact is expected for your instances. All zones are concerned.

More information may be found here: https://www.exoscale.com/syslog/mds-zombieload-ridl-fallout/

Intel MDS vulnerabilites mitigation emergency maintenance

completed

We are deploying the Intel MDS vulnerabilities mitigation. No impact is expected for your instances. All zones are concerned.

More information may be found here: https://www.exoscale.com/syslog/mds-zombieload-ridl-fallout/

VIE: Network core backbone upgrade

completed

During the maintenance window we are going to upgrade our core network backbone to provide capacity, performance and scalability improvements. No impact is expected, however redundancy will be reduced during the maintenance.

Compute: host storage maintenance at CH-DK-2

completed

During the window we are going to upgrade the storage SSDs firmware of part of our hypervisor fleet. No impact is expected.

Compute: host storage maintenance at CH-GVA-2

completed

During the window we are going to upgrade the storage SSDs firmware of part of our hypervisor fleet. No impact is expected.

Compute: host storage maintenance at DE-FRA-1

completed

During the window we are going to upgrade the storage SSDs firmware of part of our hypervisor fleet. No impact is expected.

Compute: host storage maintenance at AT-VIE-1

completed

During the window we are going to upgrade the storage SSDs firmware of part of our hypervisor fleet. No impact is expected.

Compute: Emergency maintenance at CH-DK-2

completed

During the window we are going to upgrade the storage SSDs firmware of a part of our hypervisor fleet. No impact is expected.

Compute: Emergency maintenance at CH-DK-2

completed

During the window we are going to upgrade the storage SSDs firmware of a part of our hypervisor fleet. No impact is expected.

Compute CH-DK-2 Emergency Maintenance

completed

We're going to perform a preventive power maintenance on few hypervisors in CH-DK-2.
No impact is expected during the maintenance window but we will briefly loose power redundancy.

Compute API maintenance

completed

We're going to perform a maintenance on the compute API. No impact expected.

Object storage maintenance

completed

We're going to conduct a maintenance on each zone of our Object Storage platform.
We don't expect any downtime during the maintenance window but in some cases, you might experience a brief network latency spike.

Network maintenance at GV2

completed

We are upgrading one pair of switches.
No impact is expected.

CH-DK-2: Network internet upstream maintenance

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in CH-DK-2. During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Object Storage DE-FRA-1 Emergency Maintenance

completed

We're going to conduct a series of maintenance to fix a potential overheating issue on the hardware running the object storage. During the maintenance, the number of available read replica may be reduced up to 1 for objects hosted on ...

CH-GVA-2 Network maintenance

completed

During the maintenance window we're going to physically install new core network equipments. No impact is expected during the maintenance.

Compute remote console maintenance

completed

A maintenance operation on the Exoscale compute remote console will be performed. During the operation, access to the compute instances remote console will be disabled – your compute instances will not be affected.

Object storage CH-DK-2 maintenance

completed

We're going to conduct a series of maintenance to fix a potential overheating issue on the hardware running the object storage. During the maintenance, the number of available read replica may be reduced up to 1 for objects hosted on ...

Object storage CH-DK-2 maintenance

completed

We're going to conduct a series of maintenance to fix a potential overheating issue on the hardware running the object storage. During the maintenance, the number of available read replica may be reduced up to 1 for objects hosted on ...

Object storage AT-VIE-1 maintenance

completed

We're going to conduct a series of maintenance to fix a potential overheating issue on the hardware running the object storage. During the maintenance, the number of available read replica may be reduced up to 1 for objects hosted on ...

Object storage DE-FRA-1 maintenance

completed

We're going to perform a corrective maintenance on a few object storage back-end systems. No impact is expected during the maintenance window.

Object storage CH-DK-2 maintenance

completed

We're going to conduct a series of maintenance to fix a potential overheating issue on the hardware running the object storage. During the maintenance, the number of available read replica may be reduced up to 1 for objects hosted on ...

DE-FRA-1: Network internet upstream maintenance

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in DE-FRA-1. During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Object storage CH-DK-2 maintenance

completed

We're going to conduct a series of maintenance to fix a potential overheating issue on the hardware running the object storage. During the maintenance, the number of available read replica may be reduced up to 1 for objects hosted on ...

CH-GVA-2: Network internet upstream maintenance

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in CH-GVA-2. During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Object storage CH-DK-2 Emergency maintenance

completed

We're going to conduct a series of maintenance to fix a potential overheating issue on the hardware running the object storage. During the maintenance, the number of available read replica may be reduced up to 1 for objects hosted on ...

DE-FRA-1: Network internet upstream maintenance

completed

One of our internet upstream network provider is going to perform a maintenance on its routers in DE-FRA-1. During the maintenance the traffic will be re-routed to alternate provider. No impact expected.

Compute API maintenance

completed

We're going to perform a maintenance of our API to improve performance and reliability. We expect an API downtime for a maximum of 15 minutes.

If you have any questions or concerns, please reach out to us by opening up ...

Compute API maintenance

completed

We're going to perform a maintenance on the compute API. No impact expected.

SOS migration from DK2 to new ZH5 datacenter

completed

During the maintenance window the object storage data from DK2 (Deltalis) datacenter will be migrated to ZH5 (Equinix). See https://www.exoscale.com/syslog/moving-zurich-dk2-zone/ for more information. The migration will be transparent and no impact is expected. The zone name will remain as CH-DK-2.

CH-DK-2: Compute snapshot storage maintenance

completed

Related to the datacenter move https://www.exoscale.com/syslog/moving-zurich-dk2-zone/ we're going to migrate the snapshot storage system to the new Zurich datacenter. During the maintenance window new and restore snapshot functionality will not be available.

Compute API maintenance

completed

We're going to perform a maintenance on the compute API. No impact expected.

Compute migration from DK2 to ZH5 datacenter

completed

During the maintenance window all the instances from DK2 (Deltalis) datacenter will be migrated to ZH5 (Equinix). See https://www.exoscale.com/syslog/moving-zurich-dk2-zone/ for more information. The migration will be transparent for your instances. No impact is expected during the maintenance window. The zone ...

Network test for DK2/ZRH1 planned migration

completed

Due to migration from DK2 to ZRH1 planned next year, we need to test our migration scenario, including a network change. The change is to route DK2 traffic through ZRH1 during a few minutes. During the change, no impact is ...

API maintenance

completed

We're going to perform an API maintenance. No impact is expected

Network maintenance at VIE1

completed

We are upgrading the backbone of our network for increased performances in VIE1. No impact is expected as there is a 1+1 redundancy in place.

Compute API maintenance

completed

We're going to perform an API maintenance. During the window it will not be possible to start/stop/deploy instances from the API.

GV2 network capacity upgrade

completed

The internal network capacity for the GV2 site is being upgraded.

Network upgrade in GV2

completed

We are upgrading the backbone of our network for increased performances in GV2. No impact is expected as there is a 1+1 redundancy in place.

API maintenance

completed

We're going to perform an API maintenance. No impact is expected.

Compute API maintenance

completed

We are going to perform a compute service upgrade. The API will stay operational but VM operations will be disabled (deploy, start, stop...).

Network upgrade in GV2

completed

We are upgrading the backbone of our network for increased performances in GV2. No impact is expected as there is a 1+1 redundancy in place.

Small network configuration change on all sites

completed

To improve reliability, we will push a small network change on all sites (one after another). In some cases, a very short impact may happen (less than 10s).

Compute API Emergency maintenance

completed

Following our previous maintenance, we're required to perform an emergency maintenance to fix related issues. No impact is expected during this maintenance

Network upgrade in GV2

completed

We are upgrading the backbone of our network for increased performances in GV2. No impact is expected as there is a 1+1 redundancy in place.

API maintenance

completed

We're going to perform an API maintenance. No impact is expected.

Network maintenance in GV2

completed

Configuration of our edge routers in GV2 needs to be updated. No impact is expected during the operation.

Network software update in FRA1

completed

A routine network software update will be done in FRA1. No impact is expected.

Network maintenance in GV2

completed

A configuration change needs to be pushed for GV2. During the operation, very short traffic disruptions (less than one minute) may happen.

VIE1 Network

completed

We need to operate an unscheduled maintenance on some network equipments.
We do not expect any outage during this operation.

Cross-zone network maintenance

completed

To increase performance between zones, we execute the last step of the VPN upgrade.

Cross-zone network upgrade

completed

To increase network performance and reliability, we are conducting the final steps of the cross-zone network equipments.

Compute network maintenance

completed

In order to bring new functionality and improve performance, we're performing a network maintenance on our hypervisor layer. No impact is expected during the maintenance window.

Compute API Emergency maintenance

completed

We're performing a short emergency maintenance on the compute API. During the window it will not be possible to start instances at GVA-2

Cross-zone network upgrade

completed

To improve network performance between our zones, we are upgrading some network equipments. No impact planned. This maintenance is a re-schedule of the previous one.

FRA1 Upstream internet maintenance

completed

During the maintenance window one of our upstream internet provider is going to perform a maintenance of its router. Traffic will be re-routed to alternate providers during the window.

Cross-zone network upgrade

completed

To improve network performance between our zones, we are upgrading some network equipments. No impact planned.

Portal maintenance

completed

We're going to perform a maintenance of our portal. During the maintenance window, our portal will be unavailable

Compute API Emergency maintenance

completed

We're going to perform an emergency maintenance on the compute API. During the window, the API may be briefly unavailable. It will also not be possible to start an instance on all zones.

VIE1: Compute API maintenance

completed

We're going to perform a maintenance on the compute API at VIE1. During a short time frame, start and deploy of instances will not be available

Cross-zone network upgrade

completed

To enhance the network performance between our zones, we are upgrading some network equipments.

Cross-zone network maintenance

completed

A small network upgrade is scheduled for GV2, DK2, VIE1 and FRA1 to improve performance between the sites. No impact is expected.

Cross-zone network maintenance

completed

A small network upgrade is scheduled for GV2, DK2, VIE1 and FRA1 to improve performance between the sites. No impact is expected.

Cross-zone network maintenance

completed

A small network upgrade is scheduled for GV2, DK2, VIE1 and FRA1 to improve performance between the sites. No impact is expected.

DK2: Network internet upstream emergency maintenance

completed

One of our upstream internet provider informed us that they are going to perform an emergency maintenance to reload their router due to stability issue. During the maintenance traffic will be routed to alternate links. No impact is expected.

Network upgrade in GV2, DK2, VIE1 and FRA1

completed

A small network upgrade is scheduled for GV2, DK2, VIE1 and FRA1 to improve performance between the sites. No impact is expected.

GV2: Compute API maintenance

completed

We're going to perform a maintenance on the compute API at GV2. During a short time frame, start and deploy of instances will not be available

DK2: Snapshot storage system maintenance

completed

During the maintenance we're going to perform a maintenance on one of our snapshot storage system. During the maintenance window, snapshot restore will not be available for a few minutes

DK2: Snapshot storage system maintenance

completed

During the maintenance we're going to perform a maintenance on one of our snapshot storage system. During the maintenance window, snapshot restore will not be available for a few minutes

GVA2 Upstream internet maintenance

completed

During the maintenance window one of our upstream internet provider is going to perform a maintenance of its router. Traffic will be re-routed to alternate providers during the window.

DK2: Snapshot storage system maintenance

completed

During the maintenance we're going to perform a maintenance on one of our snapshot storage system. During the maintenance window, snapshot restore will not be available for a few minutes

FRA1 Upstream internet maintenancce

completed

During the maintenance window one of our upstream internet provider is going to perform a maintenance of its router. Traffic will be re-routed to alternate providers during the window.

FRA1 Meltdown / Spectre vulnerabilities mitigation fixes deployment

completed

During the maintenance window we are going to deploy the mitigation fixes that address the Meltdown AND Spectre known vulnerabilities.

No impact expected on running instances.

Object storage new cluster deployment

completed

We are rolling out object storage to all customers

Global Hypervisor Reboot

completed

Our hypervisors will be rebooted to mitigate most variants of the Spectre and Meltdown vulnerabilities.
https://www.exoscale.ch/syslog/2018/01/04/spectre-and-meltdown/

Network maintenance at GV2

completed

Configuration of GV2 edge routers is modified to improve visibility on our network. The configuration change triggers a partial reboot of the routers. Traffic will be rerouted transparently to mitigate the impact. During the maintenance window, we expect less than ...

Network maintenance at DK2

completed

Configuration of DK2 edge routers is modified to improve visibility on our network. The configuration change triggers a partial reboot of the routers. Traffic will be rerouted transparently to mitigate the impact. During the maintenance window, we expect less than ...

Network maintenance at VIE1

completed

Configuration of VIE1 edge routers is modified to improve visibility on our network. The configuration change triggers a partial reboot of the routers. Traffic will be rerouted transparently to mitigate the impact. During the maintenance window, we expect less than ...

Compute GV2 snapshot unplanned maintenance

completed

We're are performing an unplanned maintenance on the snapshot system. During the window snapshot operations create and restore will not be available

Object storage emergency maintenance

completed

During the maintenance window we're going to proceed with an upgrade of the object storage backend systems. Higher latency spikes and error rate may be expected.

Network upgrade at GV2

completed

GV2 edge routers are being upgraded for better performance. During the maintenance window, we expect less than a minute of instability (random packet loss).

Network upgrade at DK2

completed

DK2 edge routers are being upgraded for better performance. During the maintenance window, we expect less than a minute of instability (random packet loss).

GV2 compute snapshot system maintenance

completed

We're going to perform a maintenance on the snapshots system at GV2. During the maintenance window snapshot operations (create-restore) will not be available.

DK2 Electrical remediation maintenance

completed

Related to the outage we experienced at DK2 https://status.exoscale.ch/incidents/fa3fdc52-e6af-4d7a-88e3-b5dfeb612b75/

We're going to perform a maintenance to upgrade the power distribution units (PDU) that were impacted by the outage.

During the maintenance window, our physical hosts will loose briefly their power ...

Compute API maintenance

completed

We're going to proceed with a short compute API maintenance. During the maintenance window, the API will be unavailable for around 5 minutes. Running instances will not be affected.

GV2 network maintenance

completed

A scheduled network upgrade is planned for GV2. During the maintenance, each hypervisor will be briefly disconnected from the network and reconnected a few seconds later. During this small window, the running instances won't be able to use the network. ...

DK2 network maintenance

completed

A scheduled network upgrade is planned for DK2. During the maintenance, each hypervisor will be briefly disconnected from the network and reconnected a few seconds later. During this small window, the running instances won't be able to use the network. ...

Compute API maintenance

completed

We're going to proceed with a short compute API maintenance. During the maintenance window, the API will be unavailable for around 3 minutes. Running instances will not be affected.

Compute API maintenance

completed

We're going to proceed with a short compute API maintenance. During the maintenance window, the API will be unavailable. Running instances will not be affected.

Compute API maintenance

completed

We're going to proceed with a short compute API maintenance. During the maintenance window, the API will be unavailable. Running instances will not be affected.

DK2 compute snapshot maintenance

completed

We're going to perform a maintenance of the snapshot storage system at DK2. During the maintenance window, snapshot creation and restore will be unavailable

DK2 compute snapshot unscheduled maintenance

completed

We're performing an unscheduled maintenance of the snapshot storage system at DK2. During the maintenance window, snapshot creation and restore will be unavailable

Network maintenance at DK2

completed

In order to improve our DK2 network capacity and reliability, we are going to perform a maintenance on our core switching network systems. During the maintenance, our DK2 hypervisors will be migrated to new Core network switching devices.

Impact: ...

Network maintenance at DK2

completed

n order to improve our DK2 network capacity and reliability, we are going to perform a maintenance on our core switching network systems. During the maintenance, our DK2 hypervisors will be migrated to new Core network switching devices.

Impact: ...

Network maintenance at GV2

completed

In order to improve our GV2 network capacity and reliability, we are going to perform a maintenance on our core switching network systems. During the maintenance, our GV2 hypervisors will be migrated to new Core network switching devices.

Impact: ...

Network maintenance at DK2

completed

In order to improve our DK2 network capacity and reliability, we are going to perform a maintenance on our core switching network systems. During the maintenance, our DK2 hypervisors will be migrated to new Core network switching devices.

Impact: ...

Non-impacting power maintenance at DK2

completed

During the maintenance our Datacenter provider is going to upgrade power feeds of one our network equipments rack. No impact is expected as all our equipments are designed with power redundancy.

Network maintenance at GV2

completed

In order to improve our GV2 network capacity and reliability, we are going to perform a maintenance on our core switching network systems. During the maintenance, our GV2 hypervisors will be migrated to new Core network switching devices.

Impact: ...

Network maintenance at GV2

completed

In order to improve our GV2 network capacity and reliability, we are going to perform a maintenance on our core switching network systems. During the maintenance, our GV2 hypervisors will be migrated to new Core network switching devices.

Impact: ...

Emergency power maintenance at DK2

completed

We're currently facing an issue with our power feeds at DK2. The power feeds are going to be replaced during the maintenance. Currently and during the maintenance, our compute and storage equipements will no longer be power redundant. No impact ...

CH-GV-2 non-impacting scheduled internet network maintenance

completed

During this scheduled maintenance we're going to upgrade the capacity of one of our links with our internet upstream providers. This specific link will be disabled and the internet traffic will be redirected to an alternate link. The link switch ...

Object storage scheduled maintenance

completed

During this maintenance we're going to perform a minor version upgrade of our object storage backend. There will be no impact to the service.

Network maintenance at GV2

completed

We're going to perform a network maintenance at GV2. During this maintenance, our core routing systems will be migrated to new hardware devices. We expect a very short (up to 5 seconds) interruption during the switch, which should be transparent ...

Emergency internet network maintenance at GV2

completed

We're going to perform an emergency related to incident https://status.exoscale.ch/incidents/30487f5b-fab2-444f-9d5f-762836679b04/ Our internet edge routers are going to be migrated to new hardware devices. We expect a very short (up to 5 seconds) interruption during the switch, which should be transparent ...

CH-DK-2 non-impacting internet network maintenance

completed

Our fiber network provider is going to perform a short notice maintenance on one of our internet upstream fiber link in the CH-DK-2 zone. During the maintenance, this specific link will be disabled and internet traffic will be redirected to ...

CH-GV-2 non-impacting internet network maintenance

completed

One of our upstream internet transit provider is going to relocate our connections to a new router. During the maintenance, this specific link will be disabled and internet traffic will be redirected to an alternative link. The link switch will ...

CH-DK-2 non-impacting internet network maintenance

completed

Our upstream provider is still reporting an issue with one of our internet link which is showing errors. Additional cleaning and measurements are required to troubleshoot the issue. During the maintenance, this specific link will be disabled and internet traffic ...

CH-DK-2 non-impacting internet network maintenance

completed

Our upstream provider is reporting an issue with one of our internet link which is showing errors. An optical connectors cleaning will be performed. During the maintenance, this specific link will be disabled and internet traffic will be redirected to ...

Object storage optimization maintenance

completed

We're going to perform an overnight (CET) data optimization maintenance on our Object storage cluster. During the maintenance window, higher than usual API response timel may be expected

CH-DK-2 non-impacting internet network maintenance

completed

Our datacenter provider is going to perform a maintenance on one of our internet upstream fiber link in the CH-DK-2 zone. During the maintenance, this specific link will be disabled and internet traffic will be redirected to an alternative link. ...

CH-DK-2 non-impacting internet network maintenance

completed

One of our upstream internet transit provider is going to relocate our connections to a new router. During the maintenance, this specific link will be disabled and internet traffic will be redirected to an alternative link. The link switch will ...

Object storage non-impacting network maintenance

completed

We're going to perform an object storage network overhaul In order to improve it's reliability and redundancy. No impact is expected during the maintenance window.

CH-DK-2 non-impacting internet network maintenance

completed

Our datacenter provider is going to perform a maintenance on one of our internet upstream fiber link in the CH-DK-2 zone. During the maintenance, this specific link will be disabled and internet traffic will be redirected to an alternative link. ...

Object storage non-impacting network maintenance

completed

We're going to perform an object storage network overhaul In order to improve it's reliability and redundancy. No impact is expected during the maintenance window.

Planned network maintenance on CH-GV2

completed

Our ISP will perform a maintenance in order to upgrade one of their router. The internet connection from GV2 and communication with DK-2 will be degraded few minutes (flapping).

CH-DK-2 non-impacting internet network maintenance

completed

Our datacenter provider is going to perform a maintenance on one of our internet upstream fiber link in the CH-DK-2 zone. During the maintenance, this specific link will be disabled and internet traffic will be redirected to an alternative link. ...

Planned network maintenance on CH-DK-2

completed

Routine fiber network infrastructure upgrade in CH-DK-2. No availability impact expected.

Apps repository endpoint maintenance

completed

We're going to perform a planned maintenance on our Apps repository endpoint (app.exo.io). All applications will remain available and reachable, however it won't be possible to push new code for a short time during the maintenance window. Other Exoscale services ...

Router upgrade on DK2 data center from 2016.03.02 8PM to 2016.03.03 5AM CET

completed

One of our upstreams is upgrading its router. The traffic will be transparently switched to other upstreams during the operation. No impact is planned.

Cloud controller maintenance

completed

We're going to perform a planned maintenance on our Cloud controller system. All systems will remain available and reachable, however a delay may occur during the maintenance window when creating new instances.

Object Storage network maintenance

completed

We're going to perform a network maintenance on the Object storage networking. During this maintenance, a brief outage will occur but should not be more than 60s

Scheduled Managed Cloud infrastructure maintenance

completed

Scheduled maintenance on Exoscale Managed Cloud Infrastructure @22:00 during approximately two hours

Open Cloud Compute API maintenance

completed

Beginning a scheduled maintenance. Open cloud compute web portal & API will be unavailable for approximately 15min

Network connectivity issues

completed

We are investigating network connectivity issues

Scheduled Managed Cloud Compute maintenance

completed

Starting a non impacting managed cloud compute scheduled maintenance